Flambeau

Flambeau River Papers Building Expansion and Process Improvements

Park Falls, Wis.

Services

  • Design|Build project management
  • Architectural design
  • Mechanical process engineering
  • Subconsultant management

Features

  • Complex electrical enclosure integrated into existing building's structure over the roof of the existing MCC room.
  • Installed 4160V switch and transformers for new process
  • Removed two steam turbines and replaced with coordinated Variable Frequency Drives and motors for paper machine
  • Modified steam piping as required due to turbine eliminations

Back to Portfolio